Identify the inverter first
Record the inverter brand, model and firmware version before choosing a BMS. Protocol support is negotiated between a specific BMS firmware and a specific inverter build, and a brand name alone does not establish it.
Then the physical layer
A supported protocol still fails on the wrong cable. Confirm whether the link is CAN or RS485, what the pinout is at both ends, and whether the connector is wired straight through or crossed.
- CAN or RS485 — they are not interchangeable
- Pinout at the BMS and at the inverter, checked against both manuals
- Termination requirements on the bus
- Whether the display occupies the port the inverter needs
Commissioning order
Bring the pack up on local monitoring first and confirm cell readings before connecting the inverter link. Debugging a protocol handshake against a pack that has an unrelated balance or wiring fault wastes most of a commissioning day.
Official next steps
Frequently asked questions
No. Support is specific to BMS firmware and inverter build, so both versions must be confirmed.
On some models the display occupies the port the inverter needs. Check the port map for the exact code.
Local monitoring and cell readings, before the inverter link is connected.