
Caster Battery Enclosure Kit
Battery Kit (With Caster)
Movable LiFePO4 battery enclosure kit with optional BMS and LCD
Battery Kits
The official JKESS battery-kit catalog groups enclosure kits, rack battery hardware, high-voltage BMS controls, and configured C&I ESS cabinet options in one product category for storage system buyers.
Orderable catalog
Compare physical battery kits, rack enclosure hardware, high-voltage control boxes, and configured ESS cabinet options before moving into each product detail page.

Caster Battery Enclosure Kit
Movable LiFePO4 battery enclosure kit with optional BMS and LCD

6U Rack Battery Enclosure Kit
6U rack-mount LiFePO4 enclosure kit with optional BMS and LCD

High Voltage BMS Control Kit
BCU and BMU control hardware for high-voltage battery systems

Configurable C&I ESS Cabinet
Configured-to-order integrated energy storage cabinet for commercial and industrial projects
Before selecting a SKU
The right product depends on whether the buyer needs a mechanical enclosure, a rack battery shell, high-voltage controls, or a complete project quotation.
Use the caster or 6U battery kit when the project needs a battery box, internal assembly hardware, and optional BMS or LCD support.
Use the High Voltage Kit when the system needs master and slave control boxes for high-voltage battery packs.
Use the C&I cabinet listing when the buyer is comparing configured capacities, destination, and formal project pricing.
Purchase scenarios
Quotation FAQ
Use these answers to identify configuration gaps before comparing unit prices or approving a purchase.
The included scope depends on the selected product and configuration. Battery cells, external inverter equipment, onsite installation, and external system cabling are not included unless the product page or written quotation says so.
No. The caster and 6U battery-kit listings are enclosure and assembly hardware products. Compatible LiFePO4 cells must be sourced separately unless a written quotation states otherwise.
Choose an enclosure kit for low-voltage battery assembly hardware. Choose a configured C&I ESS cabinet when the project needs integrated energy storage equipment, cooling, fire protection, PCS or EMS planning, and a formal quotation.
Verify the official domain www.batteryboxkit.com, the company name JKBMS Electronic Technology Co.,Ltd, and the official sales email zhou@jkess.com before payment or bulk purchasing.
SYSTEM NOTES
Series count, charge voltage, continuous current and protocol have to agree first. After that a home pack is a sequence where the order genuinely matters.
Open the noteINVERTER LINKConfirm the protocol revision before the hardware, isolate a silent link from the pack outward, and know what a fully working link should be doing.
Open the noteC&I CABINETkW and kWh are separate answers and the tariff decides both. Then cooling, grid equipment and fire strategy follow in an order that resists reworking.
Open the noteENGINEERING NOTES
Check a JKBMS listing against what a reseller cannot restate: the four segments of the model code, the version the board reports itself, the visible port set, and a quotation that names its own exclusions.
Read guideNAME TO PARTAll four spellings return the same hardware, so none of them narrows anything. This maps the term you searched to the artefact you were actually after: a model code, a manual, a firmware note or a cable.
Read guideORDERINGTwo order paths run on this catalog. Work out which one a product uses, what shipping costs to your destination, which currency you will be charged in, and what has to be fixed before payment.
Read guideENCLOSURE DOCSFind the JKESS enclosure document that matches the format you were shipped, and work out the four cell measurements an enclosure manual assumes you already checked.
Read guidePEAK SHAVINGWork peak shaving out of interval data: find the billing demand window, measure the energy above the threshold, size kW and kWh separately, and stop the recharge from setting the next peak.
Read guideTHERMALEstimate what a battery cabinet actually has to reject, judge the design on cell-to-cell temperature spread rather than average temperature, and price in what each cooling system costs to keep working.
Read guideBMS ARCHITECTUREBMU means different things in different datasheets. Establish what a specific controller does from its I/O list, count units from channels rather than from kWh, and find where the interlock loop really terminates.
Read guideSOURCINGNormalise C&I ESS quotations before comparing price: usable against nameplate energy, what the warranty actually measures, the line items that fall outside the scope, and who owns the integration boundary.
Read guideAPP AND BLUETOOTHConnect the JKBMS app over Bluetooth, understand pairing behaviour and permissions, and work through the connection failures reported most often.
Read guideRS485 AND CAN WIRINGIdentify the RS485 and CAN ports on a JK BMS, verify the pinout against the manual for your model, and avoid the wiring mistakes that damage a port.
Read guideFIRMWARE AND PARAMETERSUnderstand how JKBMS firmware versions affect available parameters, what to record before changing settings, and how to avoid an unrecoverable configuration.
Read guideFAMILY TABLEOne table showing what each family is built around, so a shortlist takes a minute instead of a browse.
Read guideENCLOSURE FITMeasure the cells before shortlisting a box: stack length with compression, height over the terminals, mass and rack loading.
Read guideBOARD SELECTIONWork from the pack and the inverter rating down to a handful of codes instead of browsing the list.
Read guideBD OR PBLocal monitoring or an inverter protocol link. That question decides the family before anything else does.
Read guideBALANCE CURRENTBalance current is a rate. Match it to how fast the pack drifts and how much idle time it has to recover.
Read guideBUS CHOICEThe device at the far end decides the bus. Confirm pinout, bitrate and protocol profile before buying a cable.
Read guideHIGH-VOLTAGESplit responsibilities between module slaves and the cluster master, and find what nothing in the design owns yet.
Read guidePROJECT INPUTSThe decisions that have to be settled first, and the ones that can safely stay open until the design review.
Read guideReady to power your future? Contact us for a custom quote or partnership inquiry.
WhatsApp
WeChat